|
Home
Applications
Installation
FAQ's
Design
Details
Inventor
Media
Brochure
Contact
|
Installation Process
1)
Use cold planing equipment to excavate accurately and quickly.
Grade and compact subgrade. |
|
|
2)
KWIK SLABS are lifted into place and interlocked and leveled. |
|
|
3)
Ready-mix grout is pumped through grout holes in the slab. Special
grout channels precast on the underside of the KWIK SLAB create
continuity in the grout bed and help develop full bearing of the
slab on the subgrade. |
|
|
4)
Fill KWIK JOINT steel couplers and keyways with high-strength
grout. |
|
Back to Top |