Home
Applications
Installation
FAQ's
Design Details
Inventor
Media
Brochure
Contact

Installation Process

1) Use cold planing equipment to excavate accurately and quickly. Grade and compact subgrade.

2) KWIK SLABS are lifted into place and interlocked and leveled.


3) Ready-mix grout is pumped through grout holes in the slab. Special grout channels precast on the underside of the KWIK SLAB create continuity in the grout bed and help develop full bearing of the slab on the subgrade.


4) Fill KWIK JOINT steel couplers and keyways with high-strength grout.

Back to Top


©2006 Kwik Slab, LLC All Rights Reserved | Web Design by Web Concepts Hawaii | Affiliates